Discover Toronto’s best flooring options.

   +1 (647) 704-0880  Serving All of Toronto and the GTA

Flooring Installation in Burlington

Hardwood, vinyl plank, laminate, tile and stairs, for the established streets near the lake where the original hardwood is worth saving, and the newer homes in Alton, Millcroft and the Orchard where builder floors are ready to go.

Our flooring services in Burlington

Six services, all done by our own crew. Every job starts with a free in-home estimate.

Hardwood Refinishing

The service Burlington asks us for most. Older homes south of the QEW were built with solid hardwood that can be sanded back to bare wood, re-stained and sealed.

Learn more

Hardwood Installation

Solid hardwood over wood subfloors and engineered hardwood over concrete, for main floors where the existing floor is past saving or was never wood.

Learn more

Vinyl Plank Installation

Waterproof plank for finished basements, kitchens and lakeshore condos, over the underlay the slab or the building calls for.

Learn more

Laminate Installation

A hard-wearing, budget-friendly floor for bedrooms and family rooms. Scratch-resistant and quick to install.

Learn more

Tile Installation

Porcelain and ceramic for kitchens, bathrooms and entryways, set on a properly prepared subfloor.

Learn more

Staircase Renovation

New treads, risers and railings to go with the floor. Carpeted stairs usually need new treads or capping, because the pine underneath is not stain-grade.

Learn more

Why Burlington homeowners hire Flooring Office

01

We tell you when to refinish

In an older Burlington home the hardwood under the carpet or the worn finish is often solid and worth keeping. We check it at the estimate and recommend refinishing when the floor can take it, and replacement only when it can't.

Get a free estimate
02

No travel line on your quote

Burlington is part of our regular service area. Your quote covers the job at your address, and we group Halton jobs together, so your floor starts and finishes on the same timeline as one in Toronto.

Get a free estimate
03

Our own crew, fully covered

Nothing is subcontracted: the crew that installs in North York is the crew that comes to Burlington, led by Colin. Flooring Office was founded in 2019. We are licensed, insured, WSIB-covered and NWFA-certified, and every job has a 1-year workmanship warranty.

Get a free estimate
04

One written quote, no surprises

We quote after a site visit, not over the phone. Material, labour, removal and disposal go into one written number, usually within one business day, with no hidden fees.

Get a free estimate

Flooring installation across Burlington

From Aldershot to Alton, we come to you with samples and a tape measure.

Roseland & Shoreacres

Established homes on mature lots near the lake; original hardwood refinished, stairs rebuilt

Downtown & the lakeshore

Older houses and condo towers along Lakeshore Road; refinishing in houses, approved underlay in condos

Aldershot

Bungalows and ranch houses on larger lots; main floors redone, basements finished in vinyl plank

Mountainside & Brant Hills

1960s and 70s family homes and side-splits; carpet out, hardwood in, stairs to match

Tyandaga & Headon Forest

Two-storey houses from the 1980s and 90s; worn hardwood refinished, upstairs carpet replaced

Millcroft

1990s homes around the golf course; whole-main-floor hardwood and staircase work

The Orchard

2000s subdivision homes; builder-grade floors upgraded to engineered hardwood

Alton Village

Burlington's newest neighbourhood; builder carpet and laminate replaced, basements finished

How it works

From first call to finished floors, here's what to expect

1

Free in-home estimate

We come to your Burlington home, measure every room and stair, check the subfloor and any existing hardwood, and bring samples.

2

Written quote

Usually within one business day: material, labour, removal and disposal in one number.

3

Delivery and prep

We deliver the flooring ahead of time, lift what is coming out and prepare the subfloor. For a refinish, we set the sanding and coating days with you.

4

Installation and walk-through

Our crew installs or refinishes, re-fits the trim, cleans up, hauls the waste and walks every room with you before we leave.

What affects the price of flooring work in Burlington

We don’t quote by phone, because two Burlington homes with the same square footage can need very different amounts of work. The biggest question is whether the existing hardwood can be refinished or has to be replaced; refinishing a sound floor usually costs less than a new one. After that it comes down to the flooring you choose, what has to come out, how level the subfloor is, and the stairs, which are priced by the step and the railing. Travel is not a separate line. You get one written quote after the visit, with no hidden fees.

We install across Burlington, Oakville, Milton and the rest of Halton and the GTA. See all our service areas.

Flooring in Burlington: questions we get asked

Can the hardwood in my older Burlington home be refinished?
Usually, if it is solid hardwood with enough wood left above the tongue. Many homes in Roseland, Shoreacres and Aldershot qualify. Boards that are badly cupped, water-damaged or already sanded thin need replacing. We check at the estimate and tell you which you have.
Do you charge extra to come to Burlington?
No. Your quote covers the job at your address, with no separate travel line. Burlington is part of our regular service area, and we group Halton jobs together.
Does a job in Burlington take longer than one in Toronto?
No. We group jobs by region and plan the material delivery ahead, so timelines are the same across our service area.
Should I replace the builder-grade floors in my newer home all at once?
On an open main floor, all at once is better: the boards run continuously, and you avoid transition strips and colour differences between batches. Bedrooms upstairs can be done later without it showing.
Do you remove the old flooring?
Yes. Removal and disposal are included in our quotes. Carpet, hardwood, laminate, vinyl and most tile all come out, and we haul the waste away.
How long does it take?
Single rooms are often done in a day, and a typical main floor installation takes two to three days including removal. Refinishing needs extra time for the finish to dry between coats. You get a clear timeline with your quote.

Ready to get started?

Tell us about your Burlington home and we’ll book a free in-home estimate. You’ll usually have a written quote within one business day.

Contact Us